Gaya APA
Muchtar, A. ().
ANALISIS BIAYA DAN WAKTU PROYEK PEMBANGUNAN GEDUNG ICU RSUD AGATS PAPUA DENGAN METODE CRITICAL PATH METHOD (CPM) DAN METODE TIME CRASH TRADE OFF (TCTO) (Sri Nuryati, S.T, M.).
:
.
Gaya MLA
Muchtar, Ahyar.
"ANALISIS BIAYA DAN WAKTU PROYEK PEMBANGUNAN GEDUNG ICU RSUD AGATS PAPUA DENGAN METODE CRITICAL PATH METHOD (CPM) DAN METODE TIME CRASH TRADE OFF (TCTO)".
Sri Nuryati, S.T, M.
:
,
.
FT-Sipil S-1.